The lifetime of a cutting fluid determines how long MWF-PLUS WS GEN 22 can be used before MWF-PLUS WS GEN 22 needs to be replaced. A longer fluid lifetime reduces the frequency of fluid changes, leading to cost savings, reduced downtime, and minimized waste.
Related keyword: Fluid lifetime
Different machines have varying requirements and operational conditions. A cutting fluid that is suitable for a wide range of machines, including CNC, transfer, and metalworking machines, ensures consistent performance, reduces the need for multiple products, and simplifies inventory management for manufacturers.
Threading is a machining process used to produce threads, which are helical structures on a cylindrical or conical surface. MAPAL reaming is a precision machining process that uses a multi-bladed tool called a reamer to improve the accuracy and finish of a previously drilled hole.
Aluminium has unique properties and can be softer and more adhesive than other metals. A cutting fluid specifically formulated for aluminium ensures that MWF-PLUS WS GEN 22 provides the right lubrication and cooling, preventing aluminium from sticking to the tool and ensuring a smooth finish.
A microfine emulsion in a cutting fluid ensures effective lubrication and cooling. The fine nature of the emulsion allows the fluid to penetrate critical tool/chip interfaces, resulting in superior component finishing and extended tool life.
The lifetime of a cutting fluid determines how long MWF-PLUS WS GEN 22 can be used before MWF-PLUS WS GEN 22 needs to be replaced. A longer fluid lifetime reduces the frequency of fluid changes, leading to cost savings, reduced downtime, and minimized waste.
EP stands for "Extreme Pressure." EP properties in cutting fluids refer to the fluid's ability to provide lubrication under extreme pressure conditions, preventing metal-to-metal contact and reducing wear during machining operations.
A cutting fluid's performance in challenging environments, such as those with high humidity and pollution, ensures consistent lubrication, cooling, and protection against corrosion. This leads to better machining results, extended tool life, and reduced operational issues.
A water-soluble cutting fluid is a type of metalworking fluid that can be diluted with water to form an emulsion. It is used to cool and lubricate the cutting process, reducing friction and heat generation.
General machining fluid
By continuing to use the site, you agree to the use of cookies. more information
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.